Geoff Sims @ UNSW |
Navigation
Saturday, 5th January, 2013
Tent (Geoff)
We put up our tent today. We intend to use the tent as a work area at Ridge A. It is easy to assemble (it took us just over 20 minutes, including unpacking of the boxes) and will provide a relatively warm work area:
We used an inside/outside thermometer to measure the effectiveness of the tent; the temperature was -19.9 degrees C (-3.8 F) outside, and 3.5 degrees C (38.3 F) inside, which is very promising.
And a couple more pics:
-- Geoff
← Back to South Pole Diaries 2012/13